![]() The proposed division conforms to the comprehensive plan, Shoreline Master Program, and zoning ordinance Ĭ. Each lot within the proposed division meets the access requirements of the Engineering Design and Development Standards ī. 17.36.090 Review criteriaĪ large lot subdivision shall be approved when:Ī. Any other public officials, agencies, and community groups, as required by law. Olympia Public Works Department (three copies) į. The Planning Department shall distribute copies of the large lot plat and pertinent information to the following:Ī. The application shall be on a form provided by the Department and shall include all information required by the Application Content Lists. 17.36.070 Format and content of preliminary application and mapĪ. Large lot plats shall be approved, disapproved, or returned to the applicant for modification or correction within one hundred twenty (120) calendar days from the date of filing a complete application, unless the applicant gives a written consent to the extension of such time period. 17.36.060 Time limitations for department action Any proposed large lot plat found to be inaccurate or misleading so as to hamper the decision of the Planning Department shall be returned to the applicant with a letter stating that the large lot plat must be corrected and returned to the Planning Department. 17.36.050 Responsibility for data accuracyĪccuracy for all data and information submitted on or with a large lot plat shall be the responsibility of the applicant. All submitted drawings shall be in a portable document format (".pdf") meeting the requirements of ISO32000-1, Document Management – Portable Document Format – Part 1: PDF 1.7. 17.36.030 Submission of applicationĪn electronic copy of the large lot plat shall be submitted to the Planning Department through its online portal. If the applicant owns adjacent land, the possibilities of future development should be discussed. Discussion topics at this time would include such things as the comprehensive plan, development standards, Shoreline Master Plan, zoning, availability of sewer and water, latecomer charges, development concepts, other city requirements and permits, and the environmental impact of the plat. ![]() The conference should take place prior to detailed work by an engineer or surveyor. It is the purpose of this conference to eliminate as many potential problems as possible in order for the large lot plat to be processed without delay. ![]() At this time said Director shall make available all pertinent information as may be on file relating to the general area. Prior to the submission of the large plat application, the subdivider or the subdivider’s representative may meet with the Director to discuss preliminary sketches or studies. Large lot subdivisions may be redivided pursuant to this chapter or Chapter 17.32, short plat procedures, unless the proposed redivision constitutes a subdivision, in which case redivision must be approved pursuant to Chapter 17.16, preliminary plat procedures. 17.36.010 ApplicabilityĮvery division of contiguous land, for purposes of sale, lease or transfer of ownership, into 2 or more lots, all of which are 5 acres or one 1/128 of a section land or larger, and any one of which is smaller than 40 acres or 1/16 of a section, shall proceed in compliance with this chapter and Chapters 17.04 through 17.12 and 17.40 through 17.52 of this title. 17.36.050 Responsibility for data accuracy.ġ7.36.060 Time limitations for department action.ġ7.36.070 Format and content of preliminary application and map.ġ7.36.120 Format and content of final application and map.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |